Schematics, sketches Roc's comments: The building committee of the Causeway Club asked us to help them with a master plan. Was some internal conflicts on the committee and a rather crabby man took over driving others away and they did very little of this excellent plan. John Gordon was the project manager and did some of the renderings. He had a great hand.
Description: Schematics, sketches Roc's comments: The building committee of the Causeway Club asked us to help them with a master plan. Was some internal conflicts on the committee and a rather crabby man took over driving others away and they did very little of this excellent plan. John Gordon was the project manager and did some of the renderings. He had a great hand.
Invitation to tour of the new building. Has images of the building, floor plans, and an elevation. Roc's Comments: This one was hard. The directors of the Harbor House changed and the board changed when we were in the process of doing this project. There was an understandable fracture on the board between saving the old schoolhouse on Main Street and moving to this new facility. The plans were for a state of the art daycare center, a multi use gymnasium/ meeting room and an exercise/ health facility. The Committee chose to build two of the three functions and included a mechanical system for the eventual third (exercise) wing. Carl Haskell was the project manager on this one. Either Todd Hardy or Jeff Wright did the computer drawing.
Description: Invitation to tour of the new building. Has images of the building, floor plans, and an elevation. Roc's Comments: This one was hard. The directors of the Harbor House changed and the board changed when we were in the process of doing this project. There was an understandable fracture on the board between saving the old schoolhouse on Main Street and moving to this new facility. The plans were for a state of the art daycare center, a multi use gymnasium/ meeting room and an exercise/ health facility. The Committee chose to build two of the three functions and included a mechanical system for the eventual third (exercise) wing. Carl Haskell was the project manager on this one. Either Todd Hardy or Jeff Wright did the computer drawing. [show more]
site: site conditions and removals, site layout and materials plan, site grading and drainage plan, planting plan and schedule, site details architectural: floor plans, roof and attic plans, reflected ceiling plan, elevations, building sections, wall details, door & room schedule, window details and schedule interior architectural: interior elevations, details and floor finish plan foundation and structural: foundation plan, mezzanine and deck framing plan, roof framing plan mechanical & electrical: HVAC floor plan, radiant floor plan, HVAC sections, schedules and controls, plumbing floor plan, riser diagrams and schedules, electrical: power plans, lighting plans, site plan and riser details
Description: site: site conditions and removals, site layout and materials plan, site grading and drainage plan, planting plan and schedule, site details architectural: floor plans, roof and attic plans, reflected ceiling plan, elevations, building sections, wall details, door & room schedule, window details and schedule interior architectural: interior elevations, details and floor finish plan foundation and structural: foundation plan, mezzanine and deck framing plan, roof framing plan mechanical & electrical: HVAC floor plan, radiant floor plan, HVAC sections, schedules and controls, plumbing floor plan, riser diagrams and schedules, electrical: power plans, lighting plans, site plan and riser details [show more]
Zoning and spatial analysis, boundary and topographic survey plan, floor plans, elevations, site plan, campus plan, schematic design drawings, Clark Point Road plans, sketches
Roc Caivano
2000-2004
Herrick Road, Southwest Harbor, Maine
42 sheets
22 papers, 5 paper vellum, 9 tracing papers, 6 diazo
22 papers, 5 paper vellum, 9 tracing papers, 6 diazo
Condition:
great
Description: Zoning and spatial analysis, boundary and topographic survey plan, floor plans, elevations, site plan, campus plan, schematic design drawings, Clark Point Road plans, sketches
Structures, Civic, Cultural & Recreational Structures
colored schematic Roc's comment: Christopher Hutchins asked us to design a concert pavilion for the waterfront in Bangor. We did a substantial amount of work and came up with the design and development drawings for a unique cable and canvas structure meant to look like a cluster of maple trees on the shore of the Penobscot. When we brought it to the New York engineering firm for construction development their aggressive and condescending approach made me suggest we drop the project. Chris agreed and the disappointment of the experience lead to our abandoning the project. I have a great model made of wood and mylar at home. Wish this one had gone another way.
Structures, Civic, Cultural & Recreational Structures
Creator:
Roc Caivano
Place:
Maine
Street:
Bangor
Collection:
Architectural Drawing Collection
Object ID:
ADC 0207 ROC
Location:
FF D-2
Pages:
1 sheet
Medium:
1 paper
Condition:
great
Description: colored schematic Roc's comment: Christopher Hutchins asked us to design a concert pavilion for the waterfront in Bangor. We did a substantial amount of work and came up with the design and development drawings for a unique cable and canvas structure meant to look like a cluster of maple trees on the shore of the Penobscot. When we brought it to the New York engineering firm for construction development their aggressive and condescending approach made me suggest we drop the project. Chris agreed and the disappointment of the experience lead to our abandoning the project. I have a great model made of wood and mylar at home. Wish this one had gone another way. [show more]
Sketches, site plan, foundation plan, floor plans, elevations, details, schedules, electrical, mechanical, framing plans, plumbing, fireplace details, museum display cabinet plans Roc's Comments: Wendell told us he wanted the museum to have his workshop in the hopes it would inspire others to carve. After he died his son chose to auction the items in his shop off to the highest bidder. The audience knew of Wendells wishes and no one bid except the curator of the Museum who acquired all of the items for a reasonable price. I was then asked to design a room to display his shop and a workspace for carvers and a small auditorium. We had not realized how popular the place would become and needed space for expansion. I did this work from my home studio in Philadelphia and John DeFazio a fellow employee at Venturi, Scott Brown helped with the drawings.
Roc Caivano, Harris Hyman
1980
65 sheets
8 diazo, 30 mylars, 20 paper vellum, 7 tracing papers
8 diazo, 30 mylars, 20 paper vellum, 7 tracing papers
Condition:
good
Description: Sketches, site plan, foundation plan, floor plans, elevations, details, schedules, electrical, mechanical, framing plans, plumbing, fireplace details, museum display cabinet plans Roc's Comments: Wendell told us he wanted the museum to have his workshop in the hopes it would inspire others to carve. After he died his son chose to auction the items in his shop off to the highest bidder. The audience knew of Wendells wishes and no one bid except the curator of the Museum who acquired all of the items for a reasonable price. I was then asked to design a room to display his shop and a workspace for carvers and a small auditorium. We had not realized how popular the place would become and needed space for expansion. I did this work from my home studio in Philadelphia and John DeFazio a fellow employee at Venturi, Scott Brown helped with the drawings. [show more]
October 19, 1910 Bangor Public Library plan of existing conditions of the lot for the public library. Has accompanying copy of letter a letter from 1911 about a competition for position of architect for the Bangor Public Library.
Description: October 19, 1910 Bangor Public Library plan of existing conditions of the lot for the public library. Has accompanying copy of letter a letter from 1911 about a competition for position of architect for the Bangor Public Library.
Materials from various revisions to the 1950 Northeast Harbor Library building. Includes letters to contractors, letter from contractor, floor plans and elevations.
Description: Materials from various revisions to the 1950 Northeast Harbor Library building. Includes letters to contractors, letter from contractor, floor plans and elevations.
July 3, 2007 1 sheet drawing of circulation desks. 8 1/2" x 11" papers: measurements of circulation desks and modular desk dimension plans from catalog.
Description: July 3, 2007 1 sheet drawing of circulation desks. 8 1/2" x 11" papers: measurements of circulation desks and modular desk dimension plans from catalog.
Description: Sheets with floor plans, sketches, digital schematics of inside of proposed library. Letters of agreement and contract copies included with this.
1: Videos and digital floor plans, sketches, digital schematics of inside of proposed library, Brecher and Woodward 2: Case Statement, Donor Wall, Garden Room, Newsletter files
Description: 1: Videos and digital floor plans, sketches, digital schematics of inside of proposed library, Brecher and Woodward 2: Case Statement, Donor Wall, Garden Room, Newsletter files