2 tracing papers are oversized and rolled 5 copies of Specifications for Alterations and Additions 1 copy of Estimate on Fixtures 1 copy of Specification and Proposal for Elevator Installation
Description: 2 tracing papers are oversized and rolled 5 copies of Specifications for Alterations and Additions 1 copy of Estimate on Fixtures 1 copy of Specification and Proposal for Elevator Installation
Foundation plan and details, floor plan, construction sections, wall section, existing conditions, site plan and elevation, boiler piping plan, window details
Description: Foundation plan and details, floor plan, construction sections, wall section, existing conditions, site plan and elevation, boiler piping plan, window details
Foundation plan, first floor framing, second floor framing, floor plans, elevations, building sections, interior elevations, bracket template, schedules bracket detail, window/door details, site plan.
Description: Foundation plan, first floor framing, second floor framing, floor plans, elevations, building sections, interior elevations, bracket template, schedules bracket detail, window/door details, site plan.
Elevations and details, window/door schedule, foundation plan and details, floor plans, building sections, roof plan, sections and alley elevations, sketches, drawings, proposed sidewalk renovation
Description: Elevations and details, window/door schedule, foundation plan and details, floor plans, building sections, roof plan, sections and alley elevations, sketches, drawings, proposed sidewalk renovation
Description: Floor plans, basement plan, floor plan existing conditions, life safety code, wall section, space usage, floor plan and framing, sketches, drawings
July 15, 1994 lobby floor plan, teller counter elevations, ATM entry elevation, sketches Roc's comment: Another well intentioned effort gone awry. Did some major redesign work for the Bar Harbor Bank in Bar Harbor with John Gordon as project manager. Sheldon Goldthwait was the president at the time who asked for our help. The bank board decided to go with the designer from their supply company and our plans were used but modified beyond recognition.
Description: July 15, 1994 lobby floor plan, teller counter elevations, ATM entry elevation, sketches Roc's comment: Another well intentioned effort gone awry. Did some major redesign work for the Bar Harbor Bank in Bar Harbor with John Gordon as project manager. Sheldon Goldthwait was the president at the time who asked for our help. The bank board decided to go with the designer from their supply company and our plans were used but modified beyond recognition. [show more]