July 3, 2007 1 sheet drawing of circulation desks. 8 1/2" x 11" papers: measurements of circulation desks and modular desk dimension plans from catalog.
Description: July 3, 2007 1 sheet drawing of circulation desks. 8 1/2" x 11" papers: measurements of circulation desks and modular desk dimension plans from catalog.
Description: Sheets with floor plans, sketches, digital schematics of inside of proposed library. Letters of agreement and contract copies included with this.
3 sheets: First floor plan Utility floor plan Side elevations/additions/roof framing 1 sheet: First floor plan: alterations/addition to office September 2000
Description: 3 sheets: First floor plan Utility floor plan Side elevations/additions/roof framing 1 sheet: First floor plan: alterations/addition to office September 2000
Invitation to tour of the new building. Has images of the building, floor plans, and an elevation. Roc's Comments: This one was hard. The directors of the Harbor House changed and the board changed when we were in the process of doing this project. There was an understandable fracture on the board between saving the old schoolhouse on Main Street and moving to this new facility. The plans were for a state of the art daycare center, a multi use gymnasium/ meeting room and an exercise/ health facility. The Committee chose to build two of the three functions and included a mechanical system for the eventual third (exercise) wing. Carl Haskell was the project manager on this one. Either Todd Hardy or Jeff Wright did the computer drawing.
Description: Invitation to tour of the new building. Has images of the building, floor plans, and an elevation. Roc's Comments: This one was hard. The directors of the Harbor House changed and the board changed when we were in the process of doing this project. There was an understandable fracture on the board between saving the old schoolhouse on Main Street and moving to this new facility. The plans were for a state of the art daycare center, a multi use gymnasium/ meeting room and an exercise/ health facility. The Committee chose to build two of the three functions and included a mechanical system for the eventual third (exercise) wing. Carl Haskell was the project manager on this one. Either Todd Hardy or Jeff Wright did the computer drawing. [show more]