3rd and revised edition of a continuing series of Maine Historic Preservation Commission publications documenting Maine's historic, architectural and archeological heritage.
Description: 3rd and revised edition of a continuing series of Maine Historic Preservation Commission publications documenting Maine's historic, architectural and archeological heritage.
Article about the development and research of the cetacean program "Allied Whale" with its field station on Mount Desert Rock, run by Ann Rivers and Steve Mullane.
Description: Article about the development and research of the cetacean program "Allied Whale" with its field station on Mount Desert Rock, run by Ann Rivers and Steve Mullane.
Article about Bass Harbor Lighthouse published in "The Islander Magazine", July 1982 Item also contains a chronology of Bass Harbor Head Light (photocopy).
Description: Article about Bass Harbor Lighthouse published in "The Islander Magazine", July 1982 Item also contains a chronology of Bass Harbor Head Light (photocopy).
October 15, 1987 wall sections and details Roc's comments: We did an addition to the Thayer School of Engineering at Dartmouth when I was an associate at the firm of Venturi, Rauch and Scott Brown in Philadelphia. It was a pleasure and education working for Bob Venturi and John Rauch as the Project Manager on this project. The stock market took a dive when the bids were due and this project came in one million dollars under budget. The professors were delighted when we used the money to upgrade their laboratory equipment. This was the only class 1000 clean room I was involved with and I enjoyed doing the drawings of the entry structure and overseers room myself. Tom Fisher was the project manager for the very complicated construction phase and the Boston firm Payette Associates expert laboratory designers were our partners on this project. As complicated as anything I have ever done and a great preparation for the two hospital additions we did in later years. I liked this kind of complicated work. After this project the Venturi firm was asked to do two major projects for Dartmouth.
Description: October 15, 1987 wall sections and details Roc's comments: We did an addition to the Thayer School of Engineering at Dartmouth when I was an associate at the firm of Venturi, Rauch and Scott Brown in Philadelphia. It was a pleasure and education working for Bob Venturi and John Rauch as the Project Manager on this project. The stock market took a dive when the bids were due and this project came in one million dollars under budget. The professors were delighted when we used the money to upgrade their laboratory equipment. This was the only class 1000 clean room I was involved with and I enjoyed doing the drawings of the entry structure and overseers room myself. Tom Fisher was the project manager for the very complicated construction phase and the Boston firm Payette Associates expert laboratory designers were our partners on this project. As complicated as anything I have ever done and a great preparation for the two hospital additions we did in later years. I liked this kind of complicated work. After this project the Venturi firm was asked to do two major projects for Dartmouth. [show more]
Copies of Photographs and drawings of several Northeast Harbor homes collected by Mark Cole for the Maine Historic Preservation Commission Historic Properties Survey conducted by T. Mark Cole in 1985.
Description: Copies of Photographs and drawings of several Northeast Harbor homes collected by Mark Cole for the Maine Historic Preservation Commission Historic Properties Survey conducted by T. Mark Cole in 1985.
site plan, floor plans, elevations, sections, construction details, electrical, mechanical. plumbing, heating, landscape photographs are of a 3-D model Roc's comments: Gates was the first project we did for COA when I was still in Philly working with Lyman Perry. We went to an interview and were chosen to design one single small dormitory/ home for something like 8-12 students. It was never built. But a few years later the college asked for the larger dorm that resulted in B/T.
Description: site plan, floor plans, elevations, sections, construction details, electrical, mechanical. plumbing, heating, landscape photographs are of a 3-D model Roc's comments: Gates was the first project we did for COA when I was still in Philly working with Lyman Perry. We went to an interview and were chosen to design one single small dormitory/ home for something like 8-12 students. It was never built. But a few years later the college asked for the larger dorm that resulted in B/T. [show more]
Description: Built 1902 by C. A. Candage. 1st owner Mr. Loren Kimball of Northeast Harbor as Sunnyside. 1986 owner Mr. Eugene Sordyl. 1999 Robert & Lynn Daly.
First real estate development in Northeast Harbor by James Terry Gardiner and Wiswell, consisted of seven properties designed by Fred Savage and built on speculation.
Description: First real estate development in Northeast Harbor by James Terry Gardiner and Wiswell, consisted of seven properties designed by Fred Savage and built on speculation.