1 - 10 of 10 results
Refine Your Search
Subject
- Events (2)
- People (1)
- Structures✖
- Civic✖
- Assembly Hall (1)
- Clubhouse (1)
- Community Center (3)
- Exhibition (3)
- Museum (3)
- Performing Arts (3)
- Theater (3)
Type
Place
- Southwest Harbor✖
Date
Item | Title | Type | Subject | Description | Creator | Date | Property Name | Street | Pages | Medium | Condition | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
5733 | Groundbreaking of Park Theater, Southwest Harbor |
|
| Park Theater, corner of Main Street and Clark Point Road. Roy Salisbury Collection |
|
| Description: Park Theater, corner of Main Street and Clark Point Road. Roy Salisbury Collection | |||||
1300 | Wendell Gilley's Shop |
|
| Floor plans, sections, elevations, Drawing of Wendell Gilley's shop at his home to be recreated at the museum. |
|
|
|
| Description: Floor plans, sections, elevations, Drawing of Wendell Gilley's shop at his home to be recreated at the museum. | |||
1299 | Addition to Wendell Gilley Museum |
|
| Site plan, foundation plans, floor plans, elevations, sections, details, heating, electrical, sketches |
|
|
|
|
| Description: Site plan, foundation plans, floor plans, elevations, sections, details, heating, electrical, sketches | ||
1298 | Wendell Gilley Museum Sketches and Plans |
|
| Sketches, site plan, foundation plan, floor plans, elevations, details, schedules, electrical, mechanical, framing plans, plumbing, fireplace details, museum display cabinet plans Roc's Comments: Wendell told us he wanted the museum to have his workshop in the hopes it would inspire others to carve. After he died his son chose to auction the items in his shop off to the highest bidder. The audience knew of Wendells wishes and no one bid except the curator of the Museum who acquired all of the items for a reasonable price. I was then asked to design a room to display his shop and a workspace for carvers and a small auditorium. We had not realized how popular the place would become and needed space for expansion. I did this work from my home studio in Philadelphia and John DeFazio a fellow employee at Venturi, Scott Brown helped with the drawings. |
|
|
|
|
| Description: Sketches, site plan, foundation plan, floor plans, elevations, details, schedules, electrical, mechanical, framing plans, plumbing, fireplace details, museum display cabinet plans Roc's Comments: Wendell told us he wanted the museum to have his workshop in the hopes it would inspire others to carve. After he died his son chose to auction the items in his shop off to the highest bidder. The audience knew of Wendells wishes and no one bid except the curator of the Museum who acquired all of the items for a reasonable price. I was then asked to design a room to display his shop and a workspace for carvers and a small auditorium. We had not realized how popular the place would become and needed space for expansion. I did this work from my home studio in Philadelphia and John DeFazio a fellow employee at Venturi, Scott Brown helped with the drawings. [show more] | ||
1214 | Causeway Club |
|
| Schematics, sketches Roc's comments: The building committee of the Causeway Club asked us to help them with a master plan. Was some internal conflicts on the committee and a rather crabby man took over driving others away and they did very little of this excellent plan. John Gordon was the project manager and did some of the renderings. He had a great hand. |
|
|
|
| Description: Schematics, sketches Roc's comments: The building committee of the Causeway Club asked us to help them with a master plan. Was some internal conflicts on the committee and a rather crabby man took over driving others away and they did very little of this excellent plan. John Gordon was the project manager and did some of the renderings. He had a great hand. | |||
1388 | Harbor House Southwest Harbor |
|
| site: site conditions and removals, site layout and materials plan, site grading and drainage plan, planting plan and schedule, site details architectural: floor plans, roof and attic plans, reflected ceiling plan, elevations, building sections, wall details, door & room schedule, window details and schedule interior architectural: interior elevations, details and floor finish plan foundation and structural: foundation plan, mezzanine and deck framing plan, roof framing plan mechanical & electrical: HVAC floor plan, radiant floor plan, HVAC sections, schedules and controls, plumbing floor plan, riser diagrams and schedules, electrical: power plans, lighting plans, site plan and riser details |
|
|
|
|
|
| Description: site: site conditions and removals, site layout and materials plan, site grading and drainage plan, planting plan and schedule, site details architectural: floor plans, roof and attic plans, reflected ceiling plan, elevations, building sections, wall details, door & room schedule, window details and schedule interior architectural: interior elevations, details and floor finish plan foundation and structural: foundation plan, mezzanine and deck framing plan, roof framing plan mechanical & electrical: HVAC floor plan, radiant floor plan, HVAC sections, schedules and controls, plumbing floor plan, riser diagrams and schedules, electrical: power plans, lighting plans, site plan and riser details [show more] | |
1313 | Harbor House Tour Invitation |
|
| Invitation to tour of the new building. Has images of the building, floor plans, and an elevation. Roc's Comments: This one was hard. The directors of the Harbor House changed and the board changed when we were in the process of doing this project. There was an understandable fracture on the board between saving the old schoolhouse on Main Street and moving to this new facility. The plans were for a state of the art daycare center, a multi use gymnasium/ meeting room and an exercise/ health facility. The Committee chose to build two of the three functions and included a mechanical system for the eventual third (exercise) wing. Carl Haskell was the project manager on this one. Either Todd Hardy or Jeff Wright did the computer drawing. |
|
|
|
|
| Description: Invitation to tour of the new building. Has images of the building, floor plans, and an elevation. Roc's Comments: This one was hard. The directors of the Harbor House changed and the board changed when we were in the process of doing this project. There was an understandable fracture on the board between saving the old schoolhouse on Main Street and moving to this new facility. The plans were for a state of the art daycare center, a multi use gymnasium/ meeting room and an exercise/ health facility. The Committee chose to build two of the three functions and included a mechanical system for the eventual third (exercise) wing. Carl Haskell was the project manager on this one. Either Todd Hardy or Jeff Wright did the computer drawing. [show more] | ||
1427 | Harbor House Community Center - Herrick Road FacilitySchematic Design Drawings and Proposed Design Drawings |
|
| Zoning and spatial analysis, boundary and topographic survey plan, floor plans, elevations, site plan, campus plan, schematic design drawings, Clark Point Road plans, sketches |
|
|
|
|
|
| Description: Zoning and spatial analysis, boundary and topographic survey plan, floor plans, elevations, site plan, campus plan, schematic design drawings, Clark Point Road plans, sketches | |
1130 | Picture Theatre for Byron H. Mayo & Son |
|
|
|
|
| ||||||
5753 | Park Theatre, Southwest Harbor |
|
| Roy Salisbury Collection |
|