1 - 11 of 11 results
You searched for: Place: Northeast Harbor✖Subject: Structures✖Subject: Institutional✖Subject: School✖Type: Document✖
Refine Your Search
Item | Title | Type | Subject | Description | Creator | Date | Property Name | Street | Pages | Medium | Condition | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1136 | Mount Desert High School |
|
| Architectural details drawings, floor plans, plot plan, section. |
|
|
|
| Description: Architectural details drawings, floor plans, plot plan, section. | |||
2356 | Plan of H. Smallidge and L. E. Kimball Property |
|
| Ink on parchment drawing, 20x16.5, of the properties of Herbert Smallidge and L. E. Kimball on Smallidge Hill. This site was taken by the Stetson School. House shown on the property was among the original 17 in Northeast Harbor. It was cut in half, moved and turned into two houses. |
|
|
| Description: Ink on parchment drawing, 20x16.5, of the properties of Herbert Smallidge and L. E. Kimball on Smallidge Hill. This site was taken by the Stetson School. House shown on the property was among the original 17 in Northeast Harbor. It was cut in half, moved and turned into two houses. | ||||
2610 | Property off Sea St. proposed for Consolidated High School |
|
| Blueprint, 28x24", showing contours of land, and lots, south of Sea Street proposed for Consolidated High School. It is also titled "topographical map of the Sea Street area." Names listed include: Proctor Smallidge, L. E. Kimball, Crushing Plant, Stella Hill, I. T. Moore, E. C. Ober, C. N. Small. |
|
|
|
| Description: Blueprint, 28x24", showing contours of land, and lots, south of Sea Street proposed for Consolidated High School. It is also titled "topographical map of the Sea Street area." Names listed include: Proctor Smallidge, L. E. Kimball, Crushing Plant, Stella Hill, I. T. Moore, E. C. Ober, C. N. Small. | |||
1138 | Mount Desert Elementary School Addition |
|
| Architectural details drawings, floor plans, plot plan, section. |
|
|
|
| Description: Architectural details drawings, floor plans, plot plan, section. | |||
1139 | Mount Desert Elementary School Electrical Plan |
|
| June 15, 1992 Architectural details drawings, floor plans, plot plan, section. |
|
|
|
| Description: June 15, 1992 Architectural details drawings, floor plans, plot plan, section. | |||
1097 | Addition to Stetson School |
|
| April 4, 1931 Photocopies of floor plans and elevations. Originals badly damaged. |
|
|
|
|
| Description: April 4, 1931 Photocopies of floor plans and elevations. Originals badly damaged. | ||
1094 | School Building (Stetson School) |
|
|
|
|
|
|
| ||||
1151 | Alterations to Gilman School for Union Church |
|
| 8-Nov-56 |
|
|
|
| Description: 8-Nov-56 | |||
1140 | Topological Plan for the Mount Desert Elementary School |
|
|
|
|
|
| |||||
1149 | Proposed New High School Building |
|
|
|
|
| ||||||
1088 | Northeast Harbor School House (Gilman School) |
|
| 5 copies of Specifications for Heating. 2 copies of Specifications for Alterations and Additions. |
|
|
|
|
| Description: 5 copies of Specifications for Heating. 2 copies of Specifications for Alterations and Additions. |