Description: Floor plans, basement plan, floor plan existing conditions, life safety code, wall section, space usage, floor plan and framing, sketches, drawings
July 15, 1994 lobby floor plan, teller counter elevations, ATM entry elevation, sketches Roc's comment: Another well intentioned effort gone awry. Did some major redesign work for the Bar Harbor Bank in Bar Harbor with John Gordon as project manager. Sheldon Goldthwait was the president at the time who asked for our help. The bank board decided to go with the designer from their supply company and our plans were used but modified beyond recognition.
Description: July 15, 1994 lobby floor plan, teller counter elevations, ATM entry elevation, sketches Roc's comment: Another well intentioned effort gone awry. Did some major redesign work for the Bar Harbor Bank in Bar Harbor with John Gordon as project manager. Sheldon Goldthwait was the president at the time who asked for our help. The bank board decided to go with the designer from their supply company and our plans were used but modified beyond recognition. [show more]
6 linens, 34 tracing papers, 24 blueprints elevation Topological Map of Property by Edgar I Lord. 11 oversize tracing papers remained rolled 3 copies Specifications for Cottage.
Fred L. Savage, Edgar I. Lord
Grey Rock
Harborside
64 sheets
tracing cloths, tracing papers, blueprint, plot plan
tracing cloths, tracing papers, blueprint, plot plan
Description: 6 linens, 34 tracing papers, 24 blueprints elevation Topological Map of Property by Edgar I Lord. 11 oversize tracing papers remained rolled 3 copies Specifications for Cottage.