1 - 4 of 4 results
Refine Your Search
Subject
- Events✖
- Construction (3)
- Structures✖
- Civic (3)
- Community Center (1)
- Library (2)
- Institutional (1)
- School (1)
Type
Place
- Northeast Harbor (3)
- Southwest Harbor (1)
Date
- none✖
Tags
- winter (1)
Item | Title | Type | Subject | Description | Creator | Date | Property Name | Street | Pages | Medium | Condition | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
5595 | Northeast Harbor Library |
|
| Exterior view of the 1950s library building in snow. Sign says "Northeast Harbor Public Library." Construction. |
| Description: Exterior view of the 1950s library building in snow. Sign says "Northeast Harbor Public Library." Construction. | ||||||
5598 | Mount Desert High School |
|
| Construction and exterior views of the Mount Desert High School. |
|
| Description: Construction and exterior views of the Mount Desert High School. | |||||
5094 | Northeast Harbor Library Construction |
|
| A scan of photograph of sign at site of demolished old library indicating location of transition library at Neighborhood House. The sign was removed within minutes because it did not conform to town regulations. |
|
| Description: A scan of photograph of sign at site of demolished old library indicating location of transition library at Neighborhood House. The sign was removed within minutes because it did not conform to town regulations. | |||||
1313 | Harbor House Tour Invitation |
|
| Invitation to tour of the new building. Has images of the building, floor plans, and an elevation. Roc's Comments: This one was hard. The directors of the Harbor House changed and the board changed when we were in the process of doing this project. There was an understandable fracture on the board between saving the old schoolhouse on Main Street and moving to this new facility. The plans were for a state of the art daycare center, a multi use gymnasium/ meeting room and an exercise/ health facility. The Committee chose to build two of the three functions and included a mechanical system for the eventual third (exercise) wing. Carl Haskell was the project manager on this one. Either Todd Hardy or Jeff Wright did the computer drawing. |
|
|
|
|
| Description: Invitation to tour of the new building. Has images of the building, floor plans, and an elevation. Roc's Comments: This one was hard. The directors of the Harbor House changed and the board changed when we were in the process of doing this project. There was an understandable fracture on the board between saving the old schoolhouse on Main Street and moving to this new facility. The plans were for a state of the art daycare center, a multi use gymnasium/ meeting room and an exercise/ health facility. The Committee chose to build two of the three functions and included a mechanical system for the eventual third (exercise) wing. Carl Haskell was the project manager on this one. Either Todd Hardy or Jeff Wright did the computer drawing. [show more] |